Case Study

Cannery Hall

Project Overview

Originally built as a flour mill in 1883, Cannery Hall, nestled in the heart of Nashville, TN, has undergone numerous transformations over the years. Today, it stands as a beacon of cultural significance, home to three distinct music venues: The Mil, Row One Stage, and Mainstage.

With the most recent renovation, Cannery Hall has embraced LED display technology. Each venue has been outfitted with Firefly LED’s M Series 3.9mm displays, marrying mobility with uncompromising quality. From Mainstage’s grandeur to the cozy confines of The Mil and Row One Stage, these LED video walls are aiding in bringing the artist’s performances to life.

Location

Nashville, TN

Product

M Series

Display Size

Mainstage: 49.2’ w x 9.84’ h
The Mil: 16.4’ w x 9.84’ h
Row One Stage: 13.12’ w x 6.56’ h

Pixel Pitch

3.9 mm

"LED hands down makes the whole worship experience much brighter. A lot of the church family has commented that (the LED screen) has made a huge difference in their visual worship. It’s taking service to new heights for us!"
Pastor Terrell Somerville
Founding Pastor, Freedom Church
Previous slide
Next slide

About the M Series

With its robust features and premium-grade components, the M Series sets a new standard of excellence in the market. Perfectly suited for touring, trade shows, corporate events, and a myriad of other functions requiring a large indoor mobile display, it effortlessly combines portability with uncompromising quality.